NPI – How Is a New Electronic Product Introduced into Serial Production? JM elektronik’s Lucky Seven
NPI (New Product Introduction) is the process of introducing a new electronic product into serial production. It involves a range of engineering, technological and procurement activities aimed at moving from a completed product concept to a stable, repeatable and cost-effective manufacturing process.
NPI is about much more than producing the first batch of PCBA assemblies. It also involves documentation analysis, manufacturing feasibility assessment, component availability checks, assembly process preparation, development of quality control methods and validation of the finished solution. Involving an EMS provider as early as the design stage helps identify potential problems before they result in delays, additional costs or difficulties during serial production.
What does the NPI process look like step by step?
Seven stages, one goal: a smooth transition from design to serial production. JM elektronik’s Lucky Seven NPI is a set of activities designed to help avoid unpleasant surprises on the production line.
1. Design and technical documentation review
The first stage of NPI involves a detailed review of the product design and its manufacturing requirements. Engineers analyse the technical documentation, product specifications, Gerber files, Pick and Place data and the Bill of Materials (BOM).
Particular attention is paid to the completeness and consistency of the information provided. For example, component reference designators in the schematic and assembly documentation are compared with the corresponding BOM entries. Component values, package types, polarity, orientation and the compatibility of PCB footprints with the actual dimensions of the components are also checked. Inconsistencies in these areas may lead to errors when programming assembly machines or preparing materials for production.
The review also covers functional and quality requirements, such as the product’s operating conditions, expected reliability, testing requirements and finished product identification methods. It is essential to establish whether the available documentation makes it possible not only to assemble the PCB but also to verify that it functions correctly.
Outcome: A confirmed project scope, verified documentation and a list of missing information, inconsistencies and issues requiring clarification with the customer before production preparations begin.
2. Feasibility and risk assessment – DFM, DFA, DFT and BOM
Once the initial documentation review has been completed, the design is assessed in terms of its manufacturability and production efficiency. This involves Design for Manufacturing (DFM), Design for Assembly (DFA) and Design for Testing (DFT) analyses.
DFM – Design for Manufacturing: An assessment of the design in terms of PCB fabrication and component assembly feasibility. This includes checking component spacing, solder pad accessibility, component placement in relation to PCB edges and the feasibility of using specific soldering technologies. The analysis also determines whether the selected component packages and their placement could make automated SMT assembly or subsequent THT operations more difficult.
DFA – Design for Assembly: An analysis aimed at simplifying the assembly of the complete product. It covers, among other things, the number of manual operations, component interconnection methods, access to mounting points and opportunities to reduce operations requiring additional operator involvement. It helps identify design solutions that unnecessarily increase assembly time.
DFT – Design for Testing: An assessment of the feasibility of carrying out inspections and tests. This includes checking the availability of test points, the possibility of connecting the device to a test system and methods for verifying individual functions. Proper design preparation makes subsequent electrical and functional testing easier and can also facilitate test automation.
At the same time, the BOM is analysed in terms of component availability and costs. Lead times, availability from manufacturers and distributors, minimum order quantities and the lifecycle status of individual components are verified. Particular attention is paid to EOL (End of Life) components, which are being discontinued, as well as components with very long lead times.
For example, using a component with a lead time of several weeks may make it impossible to meet the planned production schedule, even if the assembly process itself is properly prepared. In such cases, it is worth assessing the availability of alternative components well in advance. Their selection must take into account electrical, mechanical, thermal and functional parameters. The final decision to replace a component rests with the customer, and any modifications should be properly documented.
Outcome: A list of design, manufacturing and procurement risks, together with recommendations for design optimisation, alternative components, assembly simplification and test preparation.
3. Manufacturing process preparation
Once the project’s feasibility has been confirmed, the manufacturing process can be developed. At this stage, the sequence of operations is defined, assembly methods are selected and the equipment and workstations required for production are prepared.
For Surface Mount Technology (SMT), this includes preparing Pick and Place machine programmes responsible for accurately positioning SMD components on the PCB. These programmes take into account placement coordinates, component orientation, component types and feeder settings. Solder paste printer settings are also developed, the appropriate stencil is selected and reflow soldering parameters are configured.
The development of the oven’s thermal profile is particularly important. It must take into account the PCB’s thermal properties, the mass and type of components, the solder paste used and the requirements for solder joint quality. Incorrectly selected parameters may result in insufficient soldering, component overheating or solder joint defects.
For Through-Hole Technology (THT), the process of assembling through-hole components is prepared. Depending on the product design and requirements, this may involve wave soldering, selective soldering, robotic assembly or manual operations. It is essential to define the assembly sequence, component securing methods and soldering parameters.
Process preparation also includes configuring test stations, developing assembly instructions and defining quality control checkpoints. At this stage, it should already be established which operations will be inspected automatically and which will require assessment by an operator or process engineer.
Outcome: A prepared SMT/THT process, programmed equipment, configured production and test stations, and a defined quality control plan for individual production stages.
4. Prototyping and trial batches
The next stage involves physically producing prototypes or trial batches. Their purpose is to verify the assumptions made during the design review and manufacturing process preparation stages. The documentation may be complete and the design technically sound, but only actual assembly makes it possible to assess how it performs under real manufacturing conditions.
Producing a trial batch makes it possible to verify, among other things, component placement accuracy, solder paste printing quality, component positioning repeatability and soldering results. It also helps determine whether the selected component packages cause any assembly difficulties and whether the PCB design provides adequate access to solder pads.
Depending on the project stage and available resources, automatic assembly, manual assembly or a combination of both may be used. This is particularly important for complex PCBs containing BGA, MLF, Fine Pitch or miniaturised passive components. Post-PCB assembly operations also need to be verified, such as programming ICs, connecting individual PCBs into larger assemblies or installing electronics in an enclosure.
Trial production results make it possible to determine the actual time required for individual operations, identify process bottlenecks and assess whether the selected technology is suitable for the planned production volume. If problems arise, adjustments can still be made without having to modify a large serial production batch.
Outcome: Completed prototypes or trial batches, verified manufacturing assumptions and a list of issues requiring correction before serial production begins.
5. Testing and process validation
Once prototypes or a trial batch have been produced, the assembly quality and the product’s compliance with technical requirements are verified. The scope of testing depends on the device design, its intended application and the agreed specifications.
Quality control may involve several complementary methods:
SPI (Solder Paste Inspection): Inspection of solder paste printing quality before components are placed. The system analyses parameters such as the volume, height and area of the deposited paste. It helps detect insufficient or excessive paste deposits and incorrect paste positioning.
AOI-3D (Automated Optical Inspection): Automated optical inspection after SMT assembly. It enables the detection of missing or incorrectly oriented components, incorrect polarity, solder bridges, lifted leads and tombstone defects. 3D inspection also takes component height and geometry into account.
ICT (In-Circuit Test): Electrical testing of individual circuits on the PCB. Depending on the design and test fixture used, it can detect open circuits, short circuits and incorrect values of selected components.
FCT (Functional Circuit Test): Functional testing designed to verify whether the device operates as intended. It may include checking communication interfaces, input and output signals, responses to commands and the operation of individual functions. Dedicated test systems can also simulate actual user interaction with the device.
For devices requiring additional verification, other methods may also be used, such as HiPot testing to check the electrical withstand strength of insulation.
Simply recording a PASS or FAIL result is not sufficient for a comprehensive process assessment. It is also important to analyse the types and frequency of detected non-conformities. For example, recurring component placement errors may indicate a problem with the machine programme, while solder joint defects may require adjustments to the thermal profile or solder paste application parameters.
If testing reveals non-conformities, their root causes must be identified, appropriate changes implemented and the product tested again. Only successful validation confirms that both the device and the prepared manufacturing process meet the established requirements.
Outcome: Confirmed product compliance with requirements, verified inspection and testing methods, and documented validation results.
6. Approval and launch of serial production
Once validation is complete, the design and the prepared manufacturing process are formally approved. This includes approval of the documentation, software versions, Bill of Materials (BOM), manufacturing parameters and quality control procedures. It is important to clearly identify the document revisions applicable to production to avoid situations in which different batches are manufactured using inconsistent or outdated information.
A procurement plan is also prepared in parallel. It defines component requirements, order placement dates, purchasing batch sizes and required stock levels. This is particularly important for components with long lead times or limited availability. Working with a supplier experienced in electronic component distribution can facilitate purchasing coordination and reduce the risk of production interruptions.
The actual manufacturing process is then launched. Depending on the scope of the order, it includes SMT and THT assembly, in-process inspections, testing, programming, final product assembly, conformal coating, potting, packaging and preparation for shipment.
Another important element is production traceability. This involves recording information that makes it possible to link a specific product to the materials used, assembly stages and inspection results. In practice, this may include component batch numbers, PCB identifiers, dates of individual operations and ICT and FCT test results. This makes it possible to identify the specific units or batches affected if a non-conformity is detected.
Outcome: An approved and launched serial production process, prepared procurement arrangements, established quality control procedures and a traceability system enabling manufactured products to be monitored.
7. Production process monitoring and continuous improvement
Launching serial production does not mean that NPI activities are over. The process must continue to be monitored to confirm that the parameters verified during trial production are maintained at higher production volumes and across subsequent orders.
Quality performance analysis should primarily cover the number and types of detected non-conformities, the percentage of products requiring rework, the First Pass Yield (FPY) and the recurrence of problems at individual assembly stages. For example, an increase in the number of defects detected by AOI-3D may indicate component placement or soldering quality issues. Repeated FCT failures, in turn, may point to problems with a specific circuit, device software or the stability of manufacturing parameters.
Monitoring should also cover process efficiency. This involves analysing actual assembly time against initial estimates, workstation utilisation, the number of manual operations, the time required to resolve non-conformities and the amount of material wasted during production. Such data helps identify bottlenecks and assess whether costs can be reduced without compromising quality.
Another area requiring attention is supply chain monitoring. Changes in component availability, increasing lead times, price fluctuations and notifications of product discontinuation must all be tracked. If a manufacturer announces that a component is being discontinued, an early response makes it possible to plan a last-time buy or start assessing alternative solutions. Any such change must be agreed with the customer, technically verified and reflected in the product documentation.
Based on the data collected, corrective and preventive actions can be implemented. These may include adjusting soldering parameters, optimising machine programmes, changing the sequence of operations or improving assembly instructions. For recurring problems, root cause analysis methods such as 5 Whys or the Ishikawa diagram can be particularly useful.
Outcome: A more stable manufacturing process, fewer non-conformities and material losses, better cost control and a reduced risk of production downtime and delays in subsequent batches.
A process tailored to the customer’s expectations
The scope of the NPI process is not the same for every project. Individual stages, verification methods and the extent of engineering support should be tailored to the product’s specific characteristics, design complexity, quality requirements and planned production volume. Introducing an entirely new device requires different activities from transferring existing production to a new EMS provider or modifying a product that is already in production. For this reason, the NPI process should be agreed with the customer on a case-by-case basis, taking into account their expectations, documentation and technical capabilities. Not every project requires all the stages described above or the use of every testing and verification method presented.
Why work with an experienced EMS provider on NPI?
Introducing a new product requires combining expertise in electronics design, assembly technology, testing and supply chain management. Overlooking any of these areas may result in problems that only become apparent once serial production is underway.
This is why it is worth involving an EMS provider as early as the device design stage. JM elektronik supports customers in reviewing designs against manufacturing and testing requirements, optimising assembly labour requirements and verifying BOMs. Our many years of experience in electronic component distribution also enable us to identify potential procurement risks, assess component availability and consider alternative solutions.
Combining engineering expertise, SMT/THT manufacturing capabilities and quality control experience facilitates the transition from design to repeatable production. A well-managed NPI process helps reduce the risk of costly modifications, provides better control over the total cost of manufacturing and shortens the time required to bring a new product to market (time-to-market).